Engineering

The joining technology depends on various operations, machines, robots and other equipment which need to work in tandem. We offer expertise at all the levels to support the entire assembly line

Overview

Project Hours Executed : 2021 – 5,400….. | 2020 – 7,300 | 2019 – 12,000 | 2018 – 9,850 | 2017 – 11,000 | 2016 – 8,500 |

Lines: Carline | Sidewall sheet | Body Pillar | Light Rail | Waist Rail | Through Floor | Roof |

Tooling

  • Simultaneous Engineering
  • Weld Point Study
  • Weld Process Definition
  • Weld Gun Selection
  • Clamping Plans
  • Cycle Time Study
  • MTM Cycle Time Study
  • Material Flow Simulation
  • Work Cell Creation
  • Conceptual Plant Layout

Process planning

  • Production Volume – Takt Time.
  • Part Study – Part Build ups.
  • Ergo study.
  • Pneumatic design/Fluisdic design.
  • documentation of the process.

Simulation

  • Kinematics.
  • Process Path Creation.
  • SOP
  • Process Validation.
  • Weld Point segregation.
  • Selected Weld gun study

Design & 2D Detailing

  • Manufacturing Drawings.
  • Bill Of Materials (BOM).
  • Flame cut drawings.